Public Buildings

Brighton Cycle Hub

We carried out the internal decorations to the new cycle store at Brighton Station. Airless spray and conventional methods were used to complete a quality development in the city centre in 2015.

Lottery Funded Project

We have recently completed the decorations to the grade 3 listed structures at The Level in Brighton, which was part of the lottery funded regeneration of the open space near London Road in Brighton. The level of finish was very exacting and the final product is very pleasing and it is nice to think that many members of the public will be able to enjoy the new surroundings.

Haywards Heath Fire Station

West Sussex Fire Brigade Station at Haywards Heath was carried out whilst the Station was fully operational. The large areas were coated using a Graco 695 airless spray unit, whilst the rest of the building was decorated conventionally. This was a very rewarding contract completed with the minimum of fuss in a working environment.

Triangle Leisure Centre

The pool was closed down and emptied for maintenance at the end of 2010. We were employed to grind off all the rust from the water flumes and re-coat with rust inhibiting paint. The time frame for completion was very tight. We enjoy this kind of specialist work.

Raystede Animal Welfare Centre

This is the new equine facility at Raystede. All the timbers were sprayed with preservative coatings prior to fixing, which saved days of labour and expedited the work for the main contractor.